Unlike other regions of North America, there is plenty of timber in the U.S. Southeast, and a relatively new sawmill is now tapping into the plentiful timber basket of the state of Mississippi, joining three other Big River Forest Products mills—and the mill was built on a greenfield basis by North America-based Comact.

The new Gloster sawmill is now the largest facility within the Mississippi-based Big River Forest Products group of mills.

Completed in the first half of 2024 and representing a capital investment of $200 million (U.S.), this greenfield build is truly a super-mill, and can produce up to 300 million board feet of dimensional lumber and timbers annually. It requires upwards of one million tons of timber annually, which is sourced in the region.

It employs over 130 people, and supports an additional 200 indirect jobs, such as in logging. These are significant numbers regardless, but especially so as the town of Gloster where the mill is located has less than 1,000 residents.

Based in the state capital of Jackson, Mississippi, family-owned Big River Forest Products now operates four Southern Yellow Pine (SYP) lumber manufacturing facilities in Mississippi, Louisiana and Arkansas. Its operations, including the Gloster facility, have an annual production capacity of over 650 million board feet.

Gloster is located in southwest Mississippi, one of the richest timber baskets in the U.S., and adjacent to a large-scale pellet manufacturing facility.

The Gloster sawmill marks the first greenfield build for Big River Forest Products—previous projects have all involved mill acquisitions and capital upgrades. As a result, Gloster could be designed and built from scratch and features the latest sawmill technology—including Artificial Intelligence (AI).

Big River Forest Products believes the facility is in an ideal location. The surrounding region has large amounts of sustainably-grown Southern Yellow Pine on both public and private lands. The facility also has solid transportation links to large U.S. lumber markets by truck, and the company is assisting the Town of Gloster to restore the Gloster Southern Railway, which will provide service to multiple industrial customers in the area.

Big picture, some 65 per cent of Mississippi contains forest, approximately 7.9 million hectares of the state. Hardwood makes up the largest concentration of forest in the state at 45 per cent of available timber, but there is also a major supply of SYP throughout the state. A large portion of Mississippi’s timber is actually located in the southern part of the state, where Gloster is located.

The Gloster facility sits on 65 acres of land, which includes a former Georgia-Pacific mill site.

Dave Gillespie, who worked for Tolko Industries mill facilities in Canada for close to 30 years, was part of the team that oversaw the building of the Gloster facility. Gillespie is now Vice-President, Operations and joined Big River in January 2024.

Gillespie’s first exposure to the southeast came when he was appointed General Manager, U.S. Operations for Tolko’s U.S. operations in 2021, and was involved with the company’s joint ventures there: Southeastern Timber Products, LaSalle Lumber Company and Jasper Lumber. He was involved in the design/development/construction of a greenfield sawmill project in Bienville, Louisiana which provided him with Comact project services experience that was utilized with Big River Forest Products on the Gloster project team.

Gloster marks the first greenfield build for Big River—previous projects have all involved mill acquisitions and capital upgrades. As a result, Gloster could be designed and built from scratch and features the latest sawmill technology—including Artificial Intelligence (AI).

The company’s sawmill in Vicksburg, Mississippi was originally a hardwood sawmill—formerly the Vicksburg Anderson Tully hardwood mill, it was the largest volume hardwood mill in the U.S. After it shuttered, Big River purchased the mill and converted it to SYP. “Vicksburg was a large brownfield investment,” says Gillespie.

As a hardwood mill, annual production topped out at 60 million board feet and it now has the capacity to produce 180 million board feet of SYP. As part of the switchover, they installed a new planer mill from Miller Manufacturing, which is part of the Comact group.

Then came the acquisition of mill operations in Coushatta, Louisiana and Carthage, Arkansas. The Louisiana mill was already a SYP mill, and the Arkansas mill was rebuilt after a fire that occurred shortly before purchase.

The Gloster sawmill incorporates the full spectrum of Comact’s best-in-class wood processing technologies including equipment, software, automation systems, Artificial Intelligence (AI)-enabled optimization, and its plant-wide Industry 4.0 solution, OPER8. Comact’s project services team provided the design, engineering, planning, fabrication, and installation.

When Big River decided to build a greenfield facility in Gloster, they reviewed their options in terms of a building partner, and were familiar with a number of projects Comact had built in the U.S. southeast.

“We wanted to partner with a group that had the experience and capacity to take on a project of this scope,” explained Gillespie. “Comact had the track record and experience of completing greenfield projects the size of Gloster, so we decided the Comact team would be our build partner.”

“We are excited to partner with the Comact team to expand our manufacturing capacity with our first state-of-the-art greenfield lumber facility in the U.S. South,” said Billy Van Devender, CEO of Big River associated company, Claw Forestry Services. “This project will employ the best complement of modern technologies to meet our growing consumer demand for the highest quality product. Working with an industry leader like Comact provides the confidence that this major project to further enhance our vertical integration will be done right and delivered on time.”

Through its wood processing technologies and project services offering, Comact subsequently managed, designed, built, equipped, and provided full start-up services for Gloster.

“It was true project services, with Comact managing the civil as well as the equipment build,” noted Gillespie. “We essentially turned over the property to Comact to complete all of the civil, storm water requirements, concrete work and the traditional building and equipment installation.” When Big River says Gloster was a Comact greenfield project, they mean greenfield.

The Georgia-Pacific plywood facility that had been located on the site of the new mill closed permanently in 2008 and was destroyed in a fire in 2012.

Gillespie explained that as a result, there were no standing structures on the site. “It was essentially a flat piece of land.” Sometimes, new projects can make use of the infrastructure that might have been in place for previous facilities but that was not the case with Gloster.

“The short answer is no, there was no infrastructure there,” he says. “This was a greenfield project from all aspects.”

Gillespie said that Comact did a lot of civil work on the site, to meet Mississippi Department of Environmental Quality permit requirements to manage all storm water outflows. The Mississippi Development Authority provided assistance for infrastructure improvements and site development. Amite County also assisted with the project. Southwest Electric supplied the 5 MW load required for mill operations.

Gillespie says he and the other managers at Big River are very familiar with what Comact brings to the table, in terms of sawmill expertise, and equipment.

“They are a fantastic, highly skilled group at what they do,” he said. He added that one of the attributes of a strong partnership involves how build partners handle challenges—and potentially bring resources to the project, to deal with those challenges.

“It’s one thing to oversee things on a big sawmill build when things are going smoothly—it’s when the wood chips hit the fan, so to speak, that companies show what they are really made of—and Comact delivered,” says Gillespie.

Completed in the first half of 2024 and representing a capital investment of $200 million (U.S.), the Gloster sawmill is truly a super-mill, and can produce up to 300 million board feet of dimensional lumber and timbers annually. It requires upwards of one million tons of timber annually.

“We’ve been very pleased with how Comact has shown up as a partner, throughout the build. Since the mill has started, they are continuing to support both education and knowledge to the mill team. That’s a big part. You can build a state–of-the-art sawmill, but if you are unable to tool up the management and workforce to be able to operate and maintain that mill, well, you have some challenges.

“That’s really where the rubber hits the road, providing the technical skillset and knowledge transfer to support the mill team quickly growing into the roles and knowledge for the mill to be successful—and Comact has been a great partner on that.”

The Gloster operation incorporates the full spectrum of Comact’s best-in-class wood processing technologies including equipment, software, automation systems, Artificial Intelligence (AI)-enabled optimization, and its plant-wide Industry 4.0 solution, OPER8. Comact’s project services team provided the design, engineering, planning, fabrication, and installation.

The sustainment of the plant’s operational life cycle is being supported by Comact’s Aftermarket Team which is providing its Reliability Program, parts, consumables, and services.

In terms of mill equipment details, after logs are delivered to the mill site by truck, they are handled by two Fulghum radial cranes in the log yard. The cranes feed wood to the mill and its single merchandizing line. The mill has a Comact VTO high speed single ring debarker—they also opted for the Comact flare butt reducer on the debarker. The four-saw merch operation feeds two saw line infeed decks, with standard sorting by diameter, with a large diameter sort deck and a small diameter sort deck. The saw line is fully optimized with turn correction. It features a two-sided canter with quad profiling and the gang is a Comact TBL4, the newest generation of curve sawing gangs.

There is a single sawmill trim sort line—the sawmill has a 75-bin drag type sorter. The operation has three Comact Deltech continuous dry kilns all powered by natural gas.

The Comact Miller planer features hydraulic tension, and Gillespie says the planer outfeed is standard for a Comact build, a deep pile outfeed that infeeds a transverse GradExpert optimizer with AI capabilities. The planer operation features all Comact double fork stackers.

In general, it’s thought that AI will play an increasingly important role in sawmilling. It helps make sawmills like Gloster more efficient, and will have a place in future mill upgrades, and as new sawmills are built.

The planer has two sorters, a full-length sorter and a 12-foot sorter, which Gillespie says gives them virtually unlimited cut-n-two opportunities to maximize grade extraction. Often, new mills would have a 12-foot stacker and a 20-foot stacker, but Big River decided to put two 20-foot stackers in the operation, with a rollcase that can transfer between the stackers.

“We did that from an uptime and productivity perspective, to not isolate either sorter to a single stacker—we can transfer unstacked bundles between either stacker and maximize uptime in the planer.”

There are two Samuel strappers. Samuel and Fulghum (millyard cranes) are among the few non-Comact companies involved in the Gloster project.

In the yard, Gloster has all Taylor equipment for its forklifts and grapple loader. Like Big River, Taylor is also a Mississippi company. It is, in fact, just up the highway from the Big River office. Big River has Taylor equipment at its other mill operations, and is very happy with the performance of the equipment, and its relationship with Taylor, says Gillespie.

While it may seem like history at this point, conditions related to the COVID pandemic had a ripple effect on the project, which was started in 2022, and completed in 2024.

The Gloster operation has three Comact Deltech continuous dry kilns, all powered by natural gas. With the addition of the Gloster sawmill, family-owned Big River Forest Products now operates four Southern Yellow Pine (SYP) lumber manufacturing facilities, and its operations have total annual production capacity of over 650 million board feet.

“I wouldn’t say COVID was in the rear view mirror at the time,” said Gillespie. The contract to build the greenfield mill was signed in September 2022—before, Gillespie noted, a shovel was even in the ground—and the date the sawmill started was, indeed, the start date stated in that contract— April 15, 2024.

“We were able to do that by shifting around some of the phases in the construction milestones—working together with Comact, we were able to successfully start it up on time.”

It was a significant accomplishment, considering the delays COVID had on the supply chains in all industries, at the time.

Part way through the build, both Big River and Comact identified that the schedule completion date was going to be a challenge. “We were all committed to hit the sawmill start-up date,” says Gillespie.

To keep things on track to that date, Comact added resources and additional construction crew shifts. “At one point, I believe Comact had the largest construction workforce they have ever had on a project site. They were as committed as we were to starting the sawmill on schedule.”

The operation was started in phases, with the sawmill starting in April 2024, the kilns in late May, and the planer in June. The project start-up came together well, again a significant accomplishment considering all the moving parts involved in building a mill with a capacity of 300 million board feet.

“Even though the project was completed, with a greenfield project you are not buying a new car and turning the key—it’s a sawmill,” explained Gillespie. “But within weeks of start-up, Gloster was achieving shifts at pro-forma levels. The mill has continued to run at expected performance levels since then.

“From our perspective,” he added, “the commissioning and ramp-up process has been a great success.”

Paul MacDonald

Author

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Managing Vegetation in B.C. Plantations – With Sheep

Managing Vegetation in B.C. Plantations – With Sheep

Dennis Loxton built a career pioneering the use of sheep in vegetation management in the B.C. silviculture sector, and remains confident sheep farming has a future—including the use of sheep to graze plantations.

Junction Lumber Takes Another Turn for Growth

Junction Lumber Takes Another Turn for Growth

Junction Lumber Products has a history of adding to its mill facilities—and now has plans to move its growing pallet manufacturing facilities off site, to increase its efficiency.

Setting a New Bar for Thinning

Setting a New Bar for Thinning

Two very inventive New Brunswick cousins on the east coast have developed a new hot saw excavator attachment—the Timber Claw—which they believe will set a new bar for mechanized pre-commercial thinning.